The features of three- and four-tier internal dumps capacity calculation with the additional capacity preparation in the dump tiers
1 T.F. Gorbachev Kuzbass State Technical University, Mezhdurechensk branch, Mezhdurechensk, 652881, Stroitelei Avenue, 36, Russia
2 T.F. Gorbachev Kuzbass State Technical University, Kemerovo, 650000, 28 Vesennyaya st., Russia
* Corresponding author: kuzstu@kuzstu.su
The paper deals with the task of increasing the volume of rock placed in the internal dump. For that it is necessary first to analyze the existing technology of internal dumping, and then to determine the height of rock tiers being cut in the transport area. Analyzing the mining on the southern pits of Kuzbass it was found that now mostly three-tier dumps are piled. But for placing the extra volume of rock in the internal dump it will be required to pile dumps with more than three tiers.
© The Authors, published by EDP Sciences, 2017
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.