Issue |
E3S Web Conf.
Volume 33, 2018
High-Rise Construction 2017 (HRC 2017)
|
|
---|---|---|
Article Number | 03004 | |
Number of page(s) | 8 | |
Section | 3 Construction Technology and Management | |
DOI | https://doi.org/10.1051/e3sconf/20183303004 | |
Published online | 06 March 2018 |
Two-stage commercial evaluation of engineering systems production projects for high-rise buildings
Peter the Great St. Petersburg Polytechnic University, Institute of Industrial management, Economy and Trade, 195251, Polytechnicheskaya, 29, St.Petersburg, Russia
* Corresponding author: olgakalinina@bk.ru
The paper is devoted to the current and debatable problem of methodology of choosing the effective innovative enterprises for venture financing. A two-stage system of commercial innovation evaluation based on the UNIDO methodology is proposed. Engineering systems account for 25 to 40% of the cost of high-rise residential buildings. This proportion increases with the use of new construction technologies. Analysis of the construction market in Russia showed that the production of internal engineering systems elements based on innovative technologies has a growth trend. The production of simple elements is organized in small enterprises on the basis of new technologies. The most attractive for development is the use of venture financing of small innovative business. To improve the efficiency of these operations, the paper proposes a methodology for a two-stage evaluation of small business development projects. A two-stage system of commercial evaluation of innovative projects allows creating an information base for informed and coordinated decision-making on venture financing of enterprises that produce engineering systems elements for the construction business.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.