Modeling work of the dispatching service of high-rise building as queuing system
Moscow State University of Civil Engineering, Yaroslavskoe shosse, 26, Moscow, 129337, Russia
* Corresponding author: 7dem@mail.ru
The article presents the results of calculating the performance indicators of the dispatcher service of a high-rise building as a queuing system with an unlimited queue. The calculation was carried out for three models: with a single control room and brigade of service, with a single control room and a specialized service, with several dispatch centers and specialized services. The aim of the work was to investigate the influence of the structural scheme of the organization of the dispatcher service of a high-rise building on the amount of operating costs and the time of processing and fulfilling applications. The problems of high-rise construction and their impact on the complication of exploitation are analyzed. The composition of exploitation activities of high-rise buildings is analyzed. The relevance of the study is justified by the need to review the role of dispatch services in the structure of management of the quality of buildings. Dispatching service from the lower level of management of individual engineering systems becomes the main link in the centralized automated management of the exploitation of high-rise buildings. With the transition to market relations, the criterion of profitability at the organization of the dispatching service becomes one of the main parameters of the effectiveness of its work. A mathematical model for assessing the efficiency of the dispatching service on a set of quality of service indicators is proposed. The structure of operating costs is presented. The algorithm of decision-making is given when choosing the optimal structural scheme of the dispatching service of a high-rise building.
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (http://creativecommons.org/licenses/by/4.0/).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.