Modelling the development of drilling operations in iron ore quarries (based on Kachkanar MPP)
Institute of Mining, Ural Branch of the Russian Academy of Sciences, Ekaterinburg, Russia
* Corresponding author: pochta8400@inbox.ru
The necessity of application of quantitative models of drilling operations development in iron ore quarries for the justified planning of drilling volumes and the relevant fleet of drilling rigs has been shown. For this purpose, experimental regression studies of the patterns of formation and development of drilling operations in the transition period of the modern market economy have been carried out using the example of the Kachkanar Mining and Processing Plant, which has typical characteristic features and dynamics of changes in mining production in Russia. Based on the analysis of the annual technical and economic indices of Kachkanar MPP, conclusions have been drawn about the characteristics of the depression period of drilling production in the 1990s and its subsequent growth, coupled with qualitative changes in the fleet of drilling rigs and productivity thereof. In order to establish the relevant quantitative relationships and development forecasts of the drilling operations at the plant, a nonlinear regression model for the distribution of the length of wells drilled per year has been created, depending on the calendar time, the number of drilling rigs and their utilization factor. The model has a high determination factor of 0.9. It is adequate to the errors of the initial indices, it is statistically reliable, and in this confidence interval, it expresses regularities in changes in the annual length of the drilled wells. According to the regularities, interpretation of transient processes and forecast estimates of the development of drilling operations have been provided.
Key words: Forecast / Extraction / Ore / Drilling operations / Drilling rigs / Indices / Length of wells / Regression / Model
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.