Issue |
E3S Web Conf.
Volume 56, 2018
VII International Scientific Conference “Problems of Complex Development of Georesources” (PCDG 2018)
|
|
---|---|---|
Article Number | 02015 | |
Number of page(s) | 7 | |
Section | Geomechanical Problems of Development of Subsoil | |
DOI | https://doi.org/10.1051/e3sconf/20185602015 | |
Published online | 26 September 2018 |
The evaluation of the influence of tectonic structure of nikolayevsky deposit on rock-burst hazard of rock mass
Institute of Mining of Far Eastern Branch of the Russian Academy of Sciences, Khabarovsk, Russia
* Corresponding author: alex-igd@mail.ru
Using the joint analysis of seismoacoustic monitoring data and geodynamic features we have determined the consistent patterns of industrial stress field formation in deep aquifers of Nikolayevsky polymetallic deposit. This analysis allowed us to explain the hypothesis about the mechanism of hazardous geodynamic phenomena in the complex structure rock mass. Results of the research on the geostructural features of the Nikolayevsky scarn-polymetallic deposit allowed us to improve its geodynamic zoning. As the result, we have discovered major heterogeneity of the geological environment of the ore field, which defines its modern structure, as well as features of the strain-stress state of the rock mass (olistolith).
© The Authors, published by EDP Sciences, 2018
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.