Issue |
E3S Web Conf.
Volume 60, 2018
Ukrainian School of Mining Engineering
|
|
---|---|---|
Article Number | 00029 | |
Number of page(s) | 8 | |
DOI | https://doi.org/10.1051/e3sconf/20186000029 | |
Published online | 16 October 2018 |
Simulation of deposit parameters in underground development mining
1
North Caucasus Mining Metallurgical Institute, 85 Pobedy St., 308015 Vladikavkaz, Russia
2
South Russian State Polytechnic University, 132 Prosveshcheniya St., 346428 Novocherkassk, Russia
3
Kryvyi Rih National University, 11 Vitaliia Matusevycha St., 50027 Kryvyi Rih, Ukraine
* Corresponding author: morkunv@gmail.com
The article is aimed at improving development mining to prepare an ore body for stoping by access ramps to provide comfortable conditions and high technical and economic indices in underground mining. Efficient parameters of underground mining are chosen in the course of simulating data on the mining theory and practice considering ore losses and dilution on the basis of critical analysis of uranium mining enterprises’ activities. The research provides data on geological and engineering zoning of an ore deposit and physical-mechanical properties of ore bearing rocks. The advanced experience is systemized and there is provided system analysis of modern development mining schemes with access ramps (ring, spiral, one-way inclined, central inclined and across the strike). The research recommends schemes of development mining and substantiates their advantages. There are quantitative indices of physical simulation of development variants as to drawn ore quality according to criteria of soil location in ore draw points. The scientific novelty implies developing the criterion of optimality and ranking variants of development mining according to technical-economic and geomechanical indices considering some technological factors as well as the number of stopes operating simultaneously on the level. The study consists in increasing authenticity of development projects through applying complex schemes of access ramps according to the complex criterion of increasing mining depths, equipment application, ventilation and underground mine capacity.
© The Authors, published by EDP Sciences, 2018
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.