Issue |
E3S Web Conf.
Volume 97, 2019
XXII International Scientific Conference “Construction the Formation of Living Environment” (FORM-2019)
|
|
---|---|---|
Article Number | 01024 | |
Number of page(s) | 9 | |
Section | Smart City | |
DOI | https://doi.org/10.1051/e3sconf/20199701024 | |
Published online | 29 May 2019 |
Conception of the operational information model of smart city control system
Moscow State University of Civil Engineering, Yaroslavskoe shosse, 26, Moscow, 129337, Russia
* Corresponding author: KuzinaON@mgsu.ru
The article contains the BIM-models cycle, background and basic principles of creation the operational information model of smart cities control system with tools for performing the rule check, sequence of E-BIM model use. For the development and implementation of the operational information model of smart cities control system in the construction industry, it is necessary not only to determine the basic levels and parameters of choice when taking into account solutions from the organizational and technological documentation, but also to build the architecture of application software to ensure the operation of the control system at all subsequent stages of the life cycle of the smart object. It is important to determine the main factors affecting decision-making and parameters of formation of input and output data for modeling each stage of the life cycle of the object, as well as technical and economic indicators of the information model by stages [1,2].
© The Authors, published by EDP Sciences, 2019
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.