Issue |
E3S Web Conf.
Volume 100, 2019
11th Conference on Interdisciplinary Problems in Environmental Protection and Engineering EKO-DOK 2019
|
|
---|---|---|
Article Number | 00067 | |
Number of page(s) | 8 | |
DOI | https://doi.org/10.1051/e3sconf/201910000067 | |
Published online | 10 June 2019 |
Constructed wetlands aided with bio-preparation to neutralize wastewater from a small fruit and vegetable processing plant with high load pollutants
Bialystok Technical University, Faculty of Civil and Environmental Engineering, Chemical Laboratory, Wiejska Street 45E, 15-351 Bialystok, Poland
* Corresponding author: m.puchlik@pb.edu.pl
The research was carried out for real wastewater collected directly from a fruit and vegetable plant located in north-eastern Poland. Effectiveness of organic matter metabolism expressed as BOD5, COD, total suspended solids depending on the load of pollutants and bio-preparation, was determined. The use of bio-preparation in the constructed wetland allowed to increase the efficiency of wastewater treatment throughout the research period: for BOD5 by 94% in deposit with bio-preparation and by 87% in deposit without the addition of bio-preparation; however, for COD – by 93% in deposit with the addition of bio-preparation and by 87% in deposit without bio-preparation added.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.