Issue |
E3S Web Conf.
Volume 105, 2019
IVth International Innovative Mining Symposium
|
|
---|---|---|
Article Number | 01034 | |
Number of page(s) | 7 | |
Section | Environment Saving Mining Technologies | |
DOI | https://doi.org/10.1051/e3sconf/201910501034 | |
Published online | 21 June 2019 |
Study of the Conditions for Construction of the Haulage Berm in the Deposit Ledger-Wall
T.F. Gorbachev Kuzbass State Technical University, 650000 28 Vesennya st., Kemerovo, Russian Federation
* Corresponding author: baxaevas@mail.ru
To reduce transportation distance and shipping cost for rock haulage with a single-side development system, it is relevant to build roads on the spoil bank of the open-pit. The article reviews factors affecting stability of the spoil bank and the most common types of deformation. The backward calculation method for obtaining resistance to shear characteristics of the base rocks in contact with a road embankment has been described. Schemes for road constructions on the spoil bank of the open-pit have been considered. Mining and geometric simulation of the road base has been built. Zoning of the road base as per slope angle of the underlying rock and parameters of the haulage berm allow tracing rapidly axis of the technological and engineering roads for actual engineering and geological conditions. Besides, measures to reduce risk factors of landslides during construction of the haulage berm at deposit ledger-wall have been considered.
© The Authors, published by EDP Sciences, 2019
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.