Modification of the roof bolt support technology in the conditions of increasing coal mining intensity
Institute of Geotechnical Mechanics named by N. Poljakov of National Academy of Sciences of Ukraine, 49005, Dnipro, Simferopolska Str., 2a, Ukraine
* Corresponding author: igtm@ukr.net
The modification of the technology roof bolt supporting of mine workings in the conditions of increasing the coal mining intensity has been made. The technological schemes have been developed for the phased construction of roof bolting and frame support. This schemes make it possible to temporarily postpone the setting of frames in the mine working face, reduce the time and labour intensity for covering with a grid of the mine working arch and setting the bolts, as well as to increase the safety. The analysis of changes in the stress state of the border massif during the phased construction of roof bolting and frame support has been made. It is shown that the technology of phased construction of roof bolting and frame support ensures the maintaining a stable state of host rocks. In addition, the time between the extraction of the coal-rock mass and the setting of the primary support, as well as the distance between the face and the first row of roof bolts has been reduced to a minimum. The suggested approach makes possible to ensure the rate of preparatory mine workings development that are necessary for the intensification coal mining.
© The Authors, published by EDP Sciences, 2019
This is an open access article distributed under the terms of the Creative Commons Attribution License 4.0 (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.