Issue |
E3S Web Conf.
Volume 110, 2019
International Science Conference SPbWOSCE-2018 “Business Technologies for Sustainable Urban Development”
|
|
---|---|---|
Article Number | 01020 | |
Number of page(s) | 6 | |
Section | Energy Efficiency in the Construction | |
DOI | https://doi.org/10.1051/e3sconf/201911001020 | |
Published online | 09 August 2019 |
Apartment quality during warranty period of building
1 Peter the Great St. Petersburg Polytechnic University, 29, Politechnicheskaya St., St. Petersburg, 195251, Russia
2 Moscow State University of Civil Engineering, 26, Yaroslavskoye shosse, Moscow, 129337, Russia
* Corresponding author: eliza_gumerova@mail.ru
The article studies process of optimization of cost management structure for improving quality of constructional works in apartment. Property owner has the right to demand the apartment quality during the warranty period. Article 756 of the Civil code of the Russian Federation indicates the limit warranty period as 5 years. Constructional defects can be divided into two categories: general construction and engineering system defects. There are 3 methods, which are applicable to the assessment of apartment quality: ABC, target-costing and life-cycle cost analysis. It is essential to identify the parameters, which can decrease service costs and quantity of defects. Three models of apartment with different conditions are compared. Considering such parameters as the number of defects, the presence of delay in the execution of application, financial loss, presence of repeated complaint from owner, the formula of quality assessment is proposed. New equation allows assessing the quality of the apartment and defining variables, which can influence on it.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.