Issue |
E3S Web Conf.
Volume 112, 2019
8th International Conference on Thermal Equipment, Renewable Energy and Rural Development (TE-RE-RD 2019)
|
|
---|---|---|
Article Number | 02005 | |
Number of page(s) | 10 | |
Section | Renewable Energy | |
DOI | https://doi.org/10.1051/e3sconf/201911202005 | |
Published online | 20 August 2019 |
Usage of biomass CHP for balancing of power grid in Ukraine
Institute of Engineering Thermophysics of National Academy of Sciences, Zhelyabova 2a street, 03067, P.O. box 66, Kyiv-67, Ukraine
* Corresponding author: epik@biomass.kiev.ua
The article contains the first considerations of the problematic of Ukrainian grid balancing issues raised by a rapid increase of RES share in total electricity supply. The provision of balancing electricity with accent on biomass combined heat and power plants (CHP) usage is considered. Three technical concepts are proposed for engaging of existing and planned biomass CHP into balancing operation primary operating in baseload regimes, namely – greenfield biomass thermal power plant (TPP) and CHP working primary in baseload regimes and provide balancing electricity when needed (with and without steam accumulation). It is shown that there are no principle technical limitations for biomass CHP/TPP usage for grid balancing. The levelized cost of electricity (LCOE) of balancing electricity for proposed concepts are calculated and compared with the reference technology proposed by the national grid operator (gas-piston engines and/or gas turbine). According to the calculations performed the LCOE (EUR/MWh) of balancing electricity could be 77-88 EUR/MWh for biomass CHP primary operating in baseload and 216 EUR/MWh for greenfield biomass TPP against 206 EUR/MWh for gas-piston/gas-turbine for applied assumptions, prices and tariffs.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.