Issue |
E3S Web Conf.
Volume 135, 2019
Innovative Technologies in Environmental Science and Education (ITESE-2019)
|
|
---|---|---|
Article Number | 02008 | |
Number of page(s) | 16 | |
Section | Energy Efficiency in the Transport Sector | |
DOI | https://doi.org/10.1051/e3sconf/201913502008 | |
Published online | 04 December 2019 |
Organization of operation, repair and maintenance of locomotives in the railroad operating domain
Ural State University of Railway Transport, 66 Kolmogorova st., 620034, Ekaterinburg, Russia
* Corresponding author: byinosov@mail.ru
The methods that are widely used today to determine the required locomotive fleet, the Corresponding maintenance and repair system consider the locomotive as a whole, without taking into account the technical condition of its individual units, which have a limited life cycle. Furthermore, the methods used today do not take into account the time spent on relocation from an operational locomotive depot to a service depot and back. The purpose of this study is to develop the methods for determining the number of locomotives based on the anticipated workloads for specific operational sections, the necessary accompanying maintenance and repair, the optimized repair cycle structure with due account of the available resources of the limiting units in the railroad operating domain which are capable of taking into account the technical condition of equipment (failures, repair costs, and time spent on relocation from one depot to another). A model for organization of repair of gas turbine locomotives assigned to operational locomotive depots while undergoing repair in service locomotive depots is proposed. Using this model, it is possible to develop a software product for distributing routine locomotive repairs among service providers, thus optimizing the workload of the latter.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.