Assessment of the impact of the duration of construction on the effectiveness of the investment project
Moscow State University of Civil Engineering, 129337, 26, Yaroslavskoe shosse, Moscow, Russia
* Corresponding author: tranz-volga@yandex.ru
The article discusses the relevance and necessity of assessing the impact of the duration of construction on the economic efficiency of investments. Using a mathematical expression, the profit received by the investor during the life cycle of the direct investment process is described. The peculiarity of investment projects involving the creation of capital investment (real estate), is the period of time during which profit is impossible. This period of time is equal to the duration of construction, including installation of technological equipment and commissioning. An analytical description of the degree of influence of the duration of construction on the indicators of economic efficiency of the investment project (profitability and profitability of property) is proposed. On the basis of the learned expressions, a numerical experiment was performed and graphs were constructed. The results of the research prove the possibility of analytical description of the degree of influence of the duration of construction on the quantitative indicators describing the investment project (profitability (Bank interest), profitability of the created property). It seems that the described approach allows to carry out forecasts which reliability surpasses the results obtained, for example, by means of expert estimations. The proposed mathematical apparatus is much simpler than the methods of probability theory and fuzzy set theory.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.