The analysis of a Velox-type CHP plant for various gaseous fuels
Silesian University of Technology, Institute of Power Engineering and Turbomachinery, Konarskiego 18, 44-100 Gliwice, Poland
krystian.smolka@polsl.pl, slawomir.dykas@polsl.pl
For many years, the Institute of Power Engineering and Turbomachinery of the Silesian University of Technology has been using a small-capacity (about 500 kWe) steam-gas power plant. Based on many yearsof experience in operation of this power plant utilizing the Velox-type gas-steam system, an idea arose to modify this type of thermal power cycle to create a combined heat and power (CHP) plant of small capacity, dedicated for distributed heat and power production of the range up to 500 kW or production process steam with high temperature. Previous thermodynamic and economic analysis of that type of CHP plant were conducted for natural gas as afuel. The new idea is use the alternative gas fuels or waste heat for Velox-type CHP plant. An adaptation of the Velox-type CHP plant for various fuelscan be done in simple way by moving the combustion chamber out from the setof heat exchangers, in similar way as it is done for HRSG. This paper presents a thermodynamic analysis of the Velox-type steam-gas cycle fired with various alternative gas fuels such as coke gas, blast furnace gas, biogas orgas from gasification. The systems are modelled in the EBSILON® Professional 13 program.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.