Issue |
E3S Web Conf.
Volume 140, 2019
International Scientific Conference on Energy, Environmental and Construction Engineering (EECE-2019)
|
|
---|---|---|
Article Number | 04016 | |
Number of page(s) | 5 | |
Section | Energy Efficient and Green Buildings | |
DOI | https://doi.org/10.1051/e3sconf/201914004016 | |
Published online | 18 December 2019 |
Gas flow–switching arc interaction in HV synchronous gas blast interrupters
Peter the Great St. Petersburg Polytechnic University, St. Petersburg, Russian Federation
* Corresponding author: nkuriee@gmail.com
The paper is devoted to the solution of short-circuit switching problem in distribution networks by application of synchronous HV gas-blast circuit breakers (SCB). The reduction of the arcing energy by reducing the arcing time can extend the SCB expected service life by increasing its electrical life, minimizing the thermal requirements of the interrupting chamber. The paper studies the gas flow arrangement in the switching gap of the double-flow model SCB. Well-balanced and stable gas flow removes surplus energy from the switching arc. Three types of nozzle geometry are investigated. A numerical simulation with a grid reconstruction is used. A gas flow energy accumulation into the nozzle throats is observed at t=0.8-0.9 ms after the contacts opening. We evaluate the bottom time limit of the active interactions between the gas flow and the arc column before current zero under the synchronous commutation. A zone of stagnation depends on the nozzle shape and size and determines the level of the thermal-dielectric interruption ability.
© The Authors, published by EDP Sciences, 2019
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.