Issue |
E3S Web Conf.
Volume 143, 2020
2nd International Symposium on Architecture Research Frontiers and Ecological Environment (ARFEE 2019)
|
|
---|---|---|
Article Number | 01046 | |
Number of page(s) | 4 | |
Section | Architectural Engineering and Urban Construction | |
DOI | https://doi.org/10.1051/e3sconf/202014301046 | |
Published online | 24 January 2020 |
The influence of coupling on the whole process of construction simulation of chord dome structure
1 College of Civil Engineering and Architecture, Hebei University, Baoding, Hebei, 071002, China
2 Hebei construction group corporation limited, Baoding, Hebei, 071052, China
:Chord dome structure is a new type of hybrid prestressed spatial steel structure system, which is often used in large-span structures. During the construction of the structure, it is necessary to apply prestress to the ring cable. Taking the chord dome roof of Hebei North University gymnasium as an example, the whole process of prestressed cable construction is simulated and analyzed by using the finite element software ANSYS. The hoop cable of the dome roof can slide freely in the hoop direction, and the attribute of free sliding in the ANSYS interface is "coupling". In this paper, two kinds of simulation models, coupling and uncoupling, are established to compare, and then to explore the influence of coupling on the construction process of string dome structure.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.