Issue |
E3S Web Conf.
Volume 145, 2020
2019 International Academic Exchange Conference on Science and Technology Innovation (IAECST 2019)
|
|
---|---|---|
Article Number | 02028 | |
Number of page(s) | 4 | |
Section | International Conference on New Energy Science and Environmental Engineering | |
DOI | https://doi.org/10.1051/e3sconf/202014502028 | |
Published online | 06 February 2020 |
Discussion on Management and operation guarantee measures for tourist highway construction in Shanxi Province
1 Research Institute of Highway Ministry of Transport, Beijing, 100088, China
2 Road Hi-Tech Transportation Technology Group Co., Ltd. Beijing, 100088, China
With the industrial economy in Shanxi Province showing the pressure of gear shifting and transformation and upgrading, the province’s GDP growth has slowed down significantly. In sharp contrast to this, the tourism industry in Shanxi Province has maintained rapid growth, becoming a new bright spot in the transformation and development of Shanxi Province, and a new driving force for economic development. As one of the pillars of the development of the tourism industry, tourist roads have put forward new requirements for the construction scale, service quality, and operation management of tourist roads. Based on the status of the planning and demonstration construction of tourism roads in Shanxi Province, This paper analyses and discusses the management and management issues that are incomplete in the implementation process, involving too many procedures of management departments, insufficient funds, and unclear operation and profit models. Organizational management and operation guarantee measures for the whole province’s tourist highways.
© The Authors, published by EDP Sciences 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.