Issue |
E3S Web Conf.
Volume 145, 2020
2019 International Academic Exchange Conference on Science and Technology Innovation (IAECST 2019)
|
|
---|---|---|
Article Number | 02034 | |
Number of page(s) | 4 | |
Section | International Conference on New Energy Science and Environmental Engineering | |
DOI | https://doi.org/10.1051/e3sconf/202014502034 | |
Published online | 06 February 2020 |
Research of Plant Carbon Fixation and Oxygen Release
1 Yunnan Molin Expressway Construction Headquarters, Kunming, China
2 Research institute of highway ministry of transport, Beijing, China
3 Guangdong Zihui Expressway Co., Ltd, Guangzhou, China
* Corresponding author’s e-mail: 44198127@qq.com
Expressway service area is an important facility to provide various services for drivers and passengers on the expressway. With the rapid development of expressways in China and the continuous improvement of construction technology and operation level of service areas, more and more attention to the landscape design and plant ecological benefits of service areas. Based on the investigation of the capacity of carbon fixation and oxygen release of green plants in the service area of expressway, combined with the needs and characteristics of each functional area in the service area, this paper puts forward the basic principles and methods of low-carbon ecological landscape construction in the service area, studies the green plant combination mode in the service area, and improves the service level of green landscape and low-carbon ecology in the service area.
© The Authors, published by EDP Sciences 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.