Selection model of work technology based on multi–criteria evaluations
Voronezh State Technical University, 14, Moscovskiy prospect, 394026, Voronezh, Russia
* Corresponding author: kpn55@rambler
A model for the selection of options for the production of work in a construction project is considered, when each option is characterized by a set of criteria. The number of analyzed options is being reduced based on the construction of the Pareto-optimal solution set. The remaining options are used to solve the problem based on the network model,\ in which the solution will be a subcritical path that meets budgetary constraints. At the same time, the proposed comprehensive indicator characterizing the preferences of the customer makes it possible to determine alternative options for performing work in the energy project in such a way that the amount of costs allocated to implement the set of work under consideration is minimal. Another statement of the problem is also considered when it is necessary to determine a strategy for the implementation of an energy project that, given a planned budget constraint, maximizes the growth of a comprehensive indicator that characterizes customer preferences in this project. The solution of the tasks is given under the assumption of the convexity of the cost function.
© The Authors, published by EDP Sciences 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.