Issue |
E3S Web Conf.
Volume 165, 2020
2020 2nd International Conference on Civil Architecture and Energy Science (CAES 2020)
|
|
---|---|---|
Article Number | 04031 | |
Number of page(s) | 4 | |
Section | Civil, Architectural Engineering | |
DOI | https://doi.org/10.1051/e3sconf/202016504031 | |
Published online | 01 May 2020 |
Evaluation of Innovation Management of Major Projects
State Grid Energy Research Institute, Beijing, 102209, China
* Corresponding author: xialiyu@ruc.edu.cn
It is of great significance to evaluate the implementation effect of major engineering innovation management and summarize the successful or failed experience of major engineering innovation management for the smooth development of major projects in the future. We select the representative Beijing Shanghai high speed railway project, Ultra-high voltage project, Three Gorges project and Ten major aircraft project as examples to summarize the methods and effects of innovation management of major projects, and build the evaluation system of innovation management of major projects from two main dimensions of innovation management mode and innovation management mechanism to visually evaluate the effect of innovation management of major projects. The research results show that the evaluation system proposed by us has good applicability to major project innovation management, and visual display can reveal the evaluation results more intuitively.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.