Issue |
E3S Web Conf.
Volume 170, 2020
6th International Conference on Energy and City of the Future (EVF’2019)
|
|
---|---|---|
Article Number | 06015 | |
Number of page(s) | 4 | |
Section | City and Buildings of Future | |
DOI | https://doi.org/10.1051/e3sconf/202017006015 | |
Published online | 28 May 2020 |
Performance Evaluation of Baffled and Floating Hybrid Constructed Wetland Operated Under Field Conditions
Department of Civil Engineering, Walchand College of Engineering, Sangli, Maharashtra, India
* Corresponding author: guru.munvalli@walchandsangli.ac.in
Baffled and Floating Hybrid Constructed Wetland (BFHCW) consisting of constructed wetland with brickbat medium and Floating Treatment Wetland (FTW) was developed and operated under actual field flow conditions. BFHCW was vegetated with dual-species (Typha angustifolia L. and Canna indica). The performance of continuously operated system was evaluated for varied Hydraulic Loading Rate (HLR) and Organic Loading Rate (OLR) for a longer period. The system was also assessed for controlled flow rate resulting more uniform OLR and HLR. The results showed that COD removal efficiency was enhanced by 5 to 15% with controlled flow than uncontrolled highly fluctuating flow conditions. HLR has more impact on COD removal than OLR. BFHCW is effective to an extent of 25 to 40% for COD removal. BFHCW is found to be cost effective and reasonably efficient treatment for pretreated domestic wastewater.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.