Issue |
E3S Web Conf.
Volume 185, 2020
2020 International Conference on Energy, Environment and Bioengineering (ICEEB 2020)
|
|
---|---|---|
Article Number | 01029 | |
Number of page(s) | 5 | |
Section | Energy Engineering and Power System | |
DOI | https://doi.org/10.1051/e3sconf/202018501029 | |
Published online | 01 September 2020 |
Research and Analysis Based on Electricity Spot Market Construction in Northern China
1 Electric Power Research Institute of State Grid Tianjin Electric Power Company, Zip Code:300384, Xiqing District, Tianjin, China
2 State Grid Tianjin Electric Power Company, Zip Code:300010, Hebei District, Tianjin, China
* Corresponding author’s e-mail: wangsen429@163.com
Successive development of China’s power spot market has subjected the operation and dispatching mode of the existing power system to an increasingly greater influence imposed by the electricity market mechanism. In China’s northern provinces requiring winter heating, it is a huge challenge to the trading mechanism of power spot market to simultaneously guarantee the safe operation of power system and the heating mode of heating unit. To address this issue, this paper analyses the operation conditions and problems of power spot market during winter heating in northern China. Based on the analysis of the power spot market in a northern city, This paper analyzes some crucial problems in the construction of spot market and sums up policy advice for the further construction of spot market adapted to direct electricity purchase by large consumers in northern China.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.