Simulation and Analysis of Induced Current of HV Parallel Reactor Disconnector for 500kV Double Circuit Line on the Same Tower
1 Liuzhou Bureau, China Southern Power Grid EHV Power Transmission Company, Liuzhou, Guangxi, 545006, China
2 Electric Power Research Insitute. CSG, Guangzhou, Guangdong, 510610, China
* Corresponding author’s e-mail: 57116626@qq.com
The 500 kV double circuit line with HV parallel reactors has a long outage time in ice melting operation.In this paper, we discussed the possibility of directly switching HV parallel reactor disconnector under the cold standby state,in order to further optimize the operation mode of DC ice melting line.We calculated the induced current of the HV parallel reactors disconnector in the 500kV LG A and B lines, and analyzed the related factors. We also calculate the overvoltage level of the HV parallel reactor disconnector, and put forward the parameter requirements, which provides reference for the type selection.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.