Issue |
E3S Web Conf.
Volume 192, 2020
VIII International Scientific Conference “Problems of Complex Development of Georesources” (PCDG 2020)
|
|
---|---|---|
Article Number | 02003 | |
Number of page(s) | 5 | |
Section | Problems of Complex Processing of Mineral Raw Materials and New Technologies of Mineral Processing | |
DOI | https://doi.org/10.1051/e3sconf/202019202003 | |
Published online | 30 September 2020 |
Scientific substantiation and practical realization of selective comminution process of polymetallic mineral raw materials
1
Technical University Bergakademie Freiberg, Freiberg, Germany
2
Federal State-Funded Educational Institution of Higher Professional Education “Saint Petersburg Mining University”, 199106, Saint Petersburg, Russia
* Primary author: alexandrovat10@gmail.com
The results of various methods of studying structural and texture characteristics, physical and mechanical properties determining the liberation of ore minerals are presented in the article. They allow to estimate the content of ore minerals in them, to analyze particle size distribution and spatial distribution of their grains, etc. These data provide more detailed information on the strength properties of ore and the possibility of selective comminution at the stage of study and design of beneficiation schemes. The analysis of mineralogical and geochemical composition as well as the results of technological research have shown that investigated copper-nickel ores satisfy the criteria of selective comminution.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.