Issue |
E3S Web Conf.
Volume 200, 2020
The 1st Geosciences and Environmental Sciences Symposium (ICST 2020)
|
|
---|---|---|
Article Number | 02021 | |
Number of page(s) | 6 | |
Section | Environmental Management | |
DOI | https://doi.org/10.1051/e3sconf/202020002021 | |
Published online | 23 October 2020 |
Relationship between pit slope design and coal reserve estimation in Pit X, Muara Enim, South Sumatra Province
1
Geological Engineering Department, Universitas Gadjah Mada, Indonesia
2
PT. Bukit Asam Tbk., Indonesia
* Corresponding author: taufiq.wijayanto@mail.ugm.ac.id
Mine planning is an important part of mining activity. Improper mine plan will increase production costs, non-optimal extraction of mines and safety factors that do not meet the standard. One of the most important aspects before undertaking mine plan is determining the optimal slope design as a basis for making mine pits for coal extraction. This study aims to estimate the maximum reserves that can be taken from the mine pit by taking account of the safety factor of the pit slope design. The study was conducted using drill log data and rock engineering characteristics. Analysis of slope stability is done using the Rocscience Slide V.6 software while coal reserves estimation is done using Minescape V.5.2. Slope stability analysis is modeled with several scenarios of slope angles until a single optimal slope angle is obtained, with the value of the slope safety factor that meets the safety criteria. The results showed that the maximum single slope angle in a safe pit was 52° with a safety factor of 1.266, while the coal reserves obtained with the said slope angle are 29, 965, 008 tons.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.