Issue |
E3S Web Conf.
Volume 201, 2020
Ukrainian School of Mining Engineering - 2020
|
|
---|---|---|
Article Number | 01024 | |
Number of page(s) | 11 | |
DOI | https://doi.org/10.1051/e3sconf/202020101024 | |
Published online | 23 October 2020 |
Influence of voltage reserve on the parameters of parallel power active compensators in mining
1 Dnipro University of Technology, Department of Electrical Engineering, 19 Yavornytskoho Ave., 49005 Dnipro, Ukraine
2 Dnipro University of Technology, Department of Philosophy and Pedagogy, 19 Yavornytskoho Ave., 49005 Dnipro, Ukraine
3 State Mining Authority, 31 Poniatowskiego St., 40-055 Katowice, Poland
4 South Ukrainian National Pedagogical University named after K.D. Ushynsky, Department of Philosophy, Sociology and Management, 26 Staroportofrankivska St., 65020 Odesa, Ukraine
* Corresponding author: jpazynich@ukr.net
The static and dynamic reserve of voltage in input of voltage autonomous inverter being a component of parallel power active compensator on the physical realizability of inactive current components with the determined response, pulsations amplitude and commutation frequency of invertor switches was considered. Invariance of closed system of automated power quality regulation with relay control to the parametric and external disturbances is provided by the dynamic voltage reserve calculated from the obtained expressions. Special attention is given to the possibility of using this system in mining. Proposed approaches also can be used in the training of engineers in the electrical and mining industries.
© The Authors, published by EDP Sciences 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.