Issue |
E3S Web Conf.
Volume 202, 2020
The 5th International Conference on Energy, Environmental and Information System (ICENIS 2020)
|
|
---|---|---|
Article Number | 13002 | |
Number of page(s) | 15 | |
Section | Industrial and Health Information System | |
DOI | https://doi.org/10.1051/e3sconf/202020213002 | |
Published online | 10 November 2020 |
Supplier evaluation in industrial power services: a case study in gas-turbine maintenance, repair, and overhaul
Faculty of Economics and Business, Indonesia University
* Corresponding author: yordianfachrie@gmail.com
The maintenance is one of the highest costs in a gas-turbine engine, after operating cost with approximately about 14-19 % of the total cost. Some of the operators do not have spare engines, and it will lead to operation shutdown. With the current market, most MRO challenged to provide their costumer to achieve quick turnaround time (TAT) at a low cost without affecting the quality of the product. Since MRO is selling the skill services, it took applied technology, skill training, and experience to deliver quality, which needs high cost. Therefore, MRO needs to collaborate with other parties (original manufacturer or others) to increase its capacity and capability. MRO should concern more for evaluating the vendors to align with the strategies to get quick turnaround time with the right quality product. Supplier selection is the objective of this research by analyzing the selection criteria at Industrial Gas-Turbine maintenance. The highest priority is the vendor effectiveness followed by the quality, cost, risk management. The highest weight is based on the priority of the supplier.
Key words: AHP / Delphi / supplier selection / industrial gas-turbine / maintenance / repair / overhaul
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.