Issue |
E3S Web Conf.
Volume 209, 2020
ENERGY-21 – Sustainable Development & Smart Management
|
|
---|---|---|
Article Number | 06002 | |
Number of page(s) | 7 | |
Section | Session 5. Reliability of Fuel and Energy Supply to the Consumer, Energy Security | |
DOI | https://doi.org/10.1051/e3sconf/202020906002 | |
Published online | 23 November 2020 |
Impact of the regulatory reserve and capacity demand on the process of justification of the generating sources in respect of the UES Russia management development
Institute for Socio-Economic & Energy Problems of the North Federal Research Center of the Коmi Science Centre of the Ural Branch of the Russian Academy of Sciences, Syktyvkar, Russia
* Corresponding author: iespn@.ksc.komisc.; iespn@mail.komisc.ru
An analysis is made of the regulatory documents used to justify the capacity demand and one of its components - the normative capacity reserve. The methodological principles for considering energy availability at hydroelectric power stations from the standpoint of justification of reserve funds are justified. For the price zones of the UES Russia, retrospective information on the forecast values of maximum loads and power generation at hydroelectric power stations has been compared with their actual values. The article gives the practical results of influence of the identified regulatory documents inconsistencies and deviations of the maximum load forecasts and hydroelectric power generation from the actual power demand values and the justification of the generating sources to cover it under a competitive power selection procedure.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.