Issue |
E3S Web Conf.
Volume 218, 2020
2020 International Symposium on Energy, Environmental Science and Engineering (ISEESE 2020)
|
|
---|---|---|
Article Number | 01042 | |
Number of page(s) | 5 | |
Section | Research on Energy Technology Application and Consumption Structure | |
DOI | https://doi.org/10.1051/e3sconf/202021801042 | |
Published online | 11 December 2020 |
Research on Investment Structure of Voltage Level Supporting High Quality Development
1
State Grid Hubei Electric Power Co., Ltd., Development Planning Department, Wuhan Hubei, China
2
State Grid Hubei Economic Research Institute, Communication and intelligent Planning Office, Wuhan Hubei, China
* Corresponding author: Zhoum50@hb.sgcc.com.cn
In order to deal with the severe external supervision and challenges, and improve the scientific rationality of internal investment structure decision-making, this study explored the idea of voltage level investment structure decision-making considering the power grid development and operation benefits. Firstly, based on the study of the relationship between historical investment scale and power grid indicators, the investment demand of power grid is determined; secondly, the influence path of investment on business efficiency is sorted out, and the differences of investment, capital transfer and depreciation of different voltage levels are studied and determined, and the operation benefit level of the company under different investment schemes is calculated. Finally, the index system of investment structure optimization is constructed to quantify the power grid and benefit status of the company under different investment structures, so as to optimize the company’s investment scheme and promote the high-quality development of the company and power grid.
© The Authors, published by EDP Sciences, 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.