Issue |
E3S Web Conf.
Volume 233, 2021
2020 2nd International Academic Exchange Conference on Science and Technology Innovation (IAECST 2020)
|
|
---|---|---|
Article Number | 01035 | |
Number of page(s) | 4 | |
Section | NESEE2020-New Energy Science and Environmental Engineering | |
DOI | https://doi.org/10.1051/e3sconf/202123301035 | |
Published online | 27 January 2021 |
Optimization of shut-in time before drilling for each strata system in the drilling pass area in Block G
The 3rd Oil Production Factory, Daqing Oil Field Company Ltd, Daqing, China
a Corresponding author: ljhuang@petrochina.com.cn
After the A oilfield enters the ultra-high water cut period, the production level is high, the comprehensive water cut is high and the production level is high. In recent years, the number of new wells has increased considerably, affecting the increase in production year by year. Faced with these two contradictions, a new scientific and effective drilling gateway management model has been explored to reduce the impact of drilling gateways on production. This will have a very important guarantee for the realization of A oilfield's continued stable production. Based on the research and practice of the drill-off area in Block G, this paper determines the minimum injection stop time before drilling-off corresponding to each set of formations according to the bottom hole pressure change law of the injection-stop well.
© The Authors, published by EDP Sciences 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.