Issue |
E3S Web Conf.
Volume 233, 2021
2020 2nd International Academic Exchange Conference on Science and Technology Innovation (IAECST 2020)
|
|
---|---|---|
Article Number | 03060 | |
Number of page(s) | 5 | |
Section | HCCE2020-Hydraulic, Civil and Construction Engineering | |
DOI | https://doi.org/10.1051/e3sconf/202123303060 | |
Published online | 27 January 2021 |
Research on the Whole Process Cost Risk Evaluation Index System of Real Estate Park
School of Civil Engineering, North China University of Technology, Beijing, China
Corresponding author:19801289803@163.com
The development focus of real estate enterprises has shifted from traditional buildings to industrial park construction. After summarizing and analyzing the risk factors of the traditional construction cost, the WBS-CBS-RBS method is used to classify and identify the whole process cost of the industrial park. Finally, eight first level evaluation indexes and 37 second level evaluation indexes are established to form the whole process cost risk evaluation index system of the industrial park construction, which provides the basis for the whole process cost risk assessment of the subsequent industrial park construction.
© The Authors, published by EDP Sciences 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.