Issue |
E3S Web Conf.
Volume 325, 2021
ICST 2021 – The 2nd Geoscience and Environmental Management Symposium
|
|
---|---|---|
Article Number | 02001 | |
Number of page(s) | 7 | |
Section | Land, Water, and Natural Resources | |
DOI | https://doi.org/10.1051/e3sconf/202132502001 | |
Published online | 17 November 2021 |
Modified RMR to determine rock mass quality, study case of diversion tunnel in Meninting Dam, West Nusa Tenggara, Indonesia
1
Departement of Geological Engineering, Gadjah Mada University, Yogyakarta, Indonesia
2
Regional Infrastructure Development Agency, Ministry of Public Works and Housing, Indonesia
* Corresponding author: warmada@ugm.ac.id
The Meninting Dam under construction on Lombok Island, West Nusa Tenggara, Indonesia, requires a good planning to build a diversion tunnel to support its development and mobilization. The diversion tunnel is planned to be built through rocks with medium to poor rock mass quality. The planning stage involves various parameters, i.e., the rock mass classification, using either the RMR or GSI method. Converting values from one method to another makes planning work easier. However, the constraints found were the limitations of the observational data, such as discontinuity conditions. The objective of this article is to discuss the alternative depiction of discontinuity conditions in rock mass using RMR method. An alternative equation was developed to obtain a prediction model for determining the RMR value, based on GSI data. The evaluation showed that the mathematical models developed in this research had a small gap of error compared to other values. The models then can be used to predict RMR value based on GSI data and vice versa, with a higher degree of accuracy and precision according to the actual rock surface conditions, especially in the construction site of diversion tunnel at Meninting Dam.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.