Analysis of Support Systems and Excavation Methods Based on Rock Mass Quality in the Intake Tunnel of the Jlantah Dam
Geological Engineering Departement, Engineering Faculty, Gadjah Mada University, Sleman, Yogyakarta, Indonesia
* Corresponding author: doni.a.p@mail.ugm.ac.id
Research on the classification of rock mass quality in the intake tunnel Jlantah dam has not been carried out in detail because the research focuses on the location of the main dam so that empirical excavation methods and support systems have not been carried out. The rock mass quality will be used as a parameter in determining the excavation method and tunnel support system that will be used in the Jlantah Dam intake tunnel. The investigation was carried out through engineering geological mapping, core drill evaluation, and supported by laboratory test data based on the Rock Mass Rating (RMR) and Q-system rock mass classification. The rock mass at the research location based on the RMR classification is in class IV (poor rock). Based on the Q-system method, a very poor rock class is obtained. Based on the analysis of the RMR and Q-system methods, the suitable support system for engineering geological conditions such as the intake tunnel of the Jlantah Dam is shotcrete 10 cm thick, steel set with a distance of 1.5 m and rockbolt length of 1.6 m with a distance of 1.5 m. The proper excavation method for the tunnel intake is top heading and bench.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.