Commissioning Analysis and Improvement measures for Biomass Circulating Fluidized Bed Gasifier
1 Zhejiang University of Water Resources and Electric Power, Hangzhou 310018, China
2 China Jiliang University, Hangzhou 310018, China
3 Pyneo Co., Ltd., Hangzhou, Hangzhou 310012, China
* Corresponding author: liums@cjlu.edu.cn
This paper presents the debugging test of biomass circulating fluidized bed gasifier in a rice mill factory of Jiangsu Province. The main debugging process of the gasifier system is reported. The typical problems of the gasifier system during the debugging period are analyzed, including the blockage of the primary cyclone separator, blockage of loop seal, bed inventory leakage of blast cap on air distribution plate, feeding tube coking, and large fluctuation of bed pressure. Reasonable improvement countermeasures and implementation plan is provided. The operation characteristics of the gasifier are preliminaries mastered through debugging, which provides reference for the operation and adjustment of the biomass circulating fluidized bed gasifier. These results provide certain guiding significance for the scale application of biomass circulating fluidized bed gasifier.
Key words: Biomass Circulating Fluidized Bed Gasifier / Debugging Test
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.