Issue |
E3S Web Conf.
Volume 236, 2021
3rd International Conference on Energy Resources and Sustainable Development (ICERSD 2020)
|
|
---|---|---|
Article Number | 05051 | |
Number of page(s) | 5 | |
Section | Urban Environmental Architecture and Digital Design Application | |
DOI | https://doi.org/10.1051/e3sconf/202123605051 | |
Published online | 09 February 2021 |
Research on schedule control method of EPC general contract project based on Technology Management
Power China Huadong Engineering Corporation Limited, Hangzhou, Zhejiang, 311122, China
* Corresponding author: zhou_p2@ecidi.com
In order to improve the effect of EPC project schedule control, increase the precision of project control, and achieve the best project management benefits, this paper proposes a schedule control method of EPC general contract project based on technical management. The audit process of project contracting is used to optimize the management content of EPC project, and the schedule control of EPC project is realized by managing EPC project information, controlling EPC project schedule and adjusting the progress of cost engineering project. In order to verify the control effect of this method on EPC project schedule, a comparative experiment is designed. This method can effectively improve the project control accuracy, ensure the project cost and quality, and complete the operation and management objectives of the construction project in a reasonable time.
© The Authors, published by EDP Sciences 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.