Issue |
E3S Web Conf.
Volume 244, 2021
XXII International Scientific Conference Energy Management of Municipal Facilities and Sustainable Energy Technologies (EMMFT-2020)
|
|
---|---|---|
Article Number | 05008 | |
Number of page(s) | 8 | |
Section | Ecodesign and Energy Labelling | |
DOI | https://doi.org/10.1051/e3sconf/202124405008 | |
Published online | 19 March 2021 |
Construction in the digital economy: prospects and areas of transformation
1 Moscow State University of Civil Engineering, 26, Yaroslavskoe shosse, Moscow, 129337, Russia
2 Voronezh State Technical University, Moscow Avenue, 14, Voronezh, 394026, Russia
* Corresponding author: jarogacheva@mail.ru
The authors substantiated the need for digitalization of construction as an imperative of embedding the industry in the ecosystem of the digital economy, taking into account the implementation of the principle of fractality in management. The main digitalization tools have been identified, points of growth in various projections have been determined, and the impact of factors-drivers of digital transformation has been analyzed and assessed. In the process of digitalization of the construction industry, it is necessary, first of all, to ensure the integration of information models of investment and construction projects and existing state information systems. The paper considers the process of integrating the FSIS PC and the BIM design system, identifying the corresponding problem areas and the main stakeholders in the creation of an information system of pricing in construction, and differentiating the possible effects.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.