Issue |
E3S Web Conf.
Volume 245, 2021
2021 5th International Conference on Advances in Energy, Environment and Chemical Science (AEECS 2021)
|
|
---|---|---|
Article Number | 01006 | |
Number of page(s) | 4 | |
Section | Energy Development and Utilization and Energy-Saving Technology Application | |
DOI | https://doi.org/10.1051/e3sconf/202124501006 | |
Published online | 24 March 2021 |
Research on the construction plan layout of the combined Hydrogen and CNG refueling station
1 Department of Intelligent Manufacturing Engineering, Chongqing College Of Architecture And Technology, Shapingba District, Chongqing, China
2 Department of Intelligent Manufacturing Engineering, Chongqing College Of Architecture And Technology, Shapingba District, Chongqing, China
* Corresponding author: hankun@hzncc.com
Research on fuel cell hydrogen refueling stations is mostly concentrated on newly-built stations, and there are few studies on the combined hydrogen and CNG refueling stations. The construction plan of combined hydrogen and CNG refueling stations is conducive to planning and layout, solving the difficulties in land use of hydrogen refueling stations, and reducing construction investment and operating costs. This paper analyzes the feasibility of the combined station construction, studies the construction plan and scale of the combined station, and proposes its general layout plan.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.