Issue |
E3S Web Conf.
Volume 248, 2021
2021 3rd International Conference on Civil Architecture and Energy Science (CAES 2021)
|
|
---|---|---|
Article Number | 03021 | |
Number of page(s) | 4 | |
Section | Research on Civil Water Conservancy Engineering and Urban Architecture | |
DOI | https://doi.org/10.1051/e3sconf/202124803021 | |
Published online | 12 April 2021 |
Development of 66kV Isolation Switch V Type Porcelain Column Fracture Insulation Protection Frame
State Grid Jilin Electric Power Company Limited Baishan Power Supply Company, Baishan, Jilin, 134300, China
* Corresponding author: 983720738@qq.com
The mechanical strength of old 66kV disconnect switches (V-type porcelain column type) in outdoor substations has been affected by weather and daily operation for a long time, and the change of internal force of porcelain column caused by external force during open and closed circuit operation is very likely to cause porcelain column fracture, which poses a safety hazard to the safety of people and equipment. In order to ensure the safety of personal and equipment during operation and maintenance of the switch, this paper proposes a kind of insulation protection frame for 66kV disconnecting switch V-type porcelain column fracture. The simple structure, flexible operation, safety and reliability of this protective frame have been proved by practice that after using this protective frame in work, the efficiency of work is obviously improved and the safety of personal and equipment is effectively guaranteed.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.