Issue |
E3S Web Conf.
Volume 248, 2021
2021 3rd International Conference on Civil Architecture and Energy Science (CAES 2021)
|
|
---|---|---|
Article Number | 03057 | |
Number of page(s) | 4 | |
Section | Research on Civil Water Conservancy Engineering and Urban Architecture | |
DOI | https://doi.org/10.1051/e3sconf/202124803057 | |
Published online | 12 April 2021 |
Research on Existing Problems and Improvement Measures of Fabricated Composite Wallboard
School of Architecture and Engineering, Nanjing Institute of Technology, Nanjing, Jiangsu, 211167, China
* Corresponding author’s e-mail: Ziyang Yu, 2715071373@qq.com
In recent years, fabricated composite wall panels have been widely used in building materials markets at home and abroad, and their main advantages are convenient construction, low energy consumption, and heat and sound insulation. However, fabricated composite wall panels also have some common problems in practical applications, such as large dead weight, weak seismic performance, prone to cracks, and failing to meet the higher energy-saving requirements of thermal insulation external walls. This article analyzes the board material and overall structure of the fabricated composite wallboard, proposes corresponding solutions to make up for its weakness in some performance, and gives the specific construction process and accuracy requirements.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.