Issue |
E3S Web Conf.
Volume 253, 2021
2021 International Conference on Environmental and Engineering Management (EEM 2021)
|
|
---|---|---|
Article Number | 02013 | |
Number of page(s) | 4 | |
Section | Big Data Environment Management Application and Industry Research | |
DOI | https://doi.org/10.1051/e3sconf/202125302013 | |
Published online | 06 May 2021 |
Study on Factors Influencing Production Cost of Prefabricated Components Based on AHP
School of Economics and Management, Beijing Jiaotong University Beijing, China
Corresponding author: luwb2015@126.com
Because of the high cost, the development of prefabricated buildings in China is slow. As a significant part of the total cost of prefabricated buildings, the cost of prefabricated components has a great impact on the total cost. In this paper, the influencing factors of component production cost are analyzed in detail from five aspects of labor cost, material cost, machinery cost, external environment condition and internal production management arrangement, and the index system of influencing factors of production cost is constructed. Using the analytic hierarchy process model, the influencing factors are determined as: material cost > labor cost > machinery cost > internal production and management arrangement > external environment condition, and then it is put forward Corresponding cost control measures for component production.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.