Issue |
E3S Web Conf.
Volume 256, 2021
2021 International Conference on Power System and Energy Internet (PoSEI2021)
|
|
---|---|---|
Article Number | 01026 | |
Number of page(s) | 9 | |
Section | Smart Grid Technology and Power System Regulation Modeling | |
DOI | https://doi.org/10.1051/e3sconf/202125601026 | |
Published online | 10 May 2021 |
Research on Two-stage Game Strategy of Virtual Power Plant in Deep Peak Regulation Auxiliary Service Market
Control and Computer Engineering School, North China Electric Power University, Beijing, China
* Corresponding author’s e-mail: 1182227024@ncepu.edu.cn
There is a large number of combined heat and power units in northern China, and due to the limit of heating demand, the operating mode of setting electricity by heat of combined heat and power units has seriously took over the consumption space of other energy, resulting in severe wind power curtailment and rationing situation in some areas, so this paper studies the deep peak regulation bidding strategy problem considering multiple uncertainties on virtual power plants, and established a two-staged optimization model of virtual power plant to maximize the net revenue, then introduced the Shapely value method with correction coefficient redistribute the peak regulation revenue. The simulation results showed that the two-stage bidding model can not only improve the market competitiveness of the virtual power plant, but also promote the consumption of renewable energy and reduce the market peak regulation service cost. Meanwhile, the improved apportion method can effectively guarantee the enthusiasm of all kinds of units to participate in the deep peak regulation market.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.