Issue |
E3S Web Conf.
Volume 258, 2021
Ural Environmental Science Forum “Sustainable Development of Industrial Region” (UESF-2021)
|
|
---|---|---|
Article Number | 09043 | |
Number of page(s) | 11 | |
Section | Energy Efficiency in Construction | |
DOI | https://doi.org/10.1051/e3sconf/202125809043 | |
Published online | 20 May 2021 |
Determining the optimal construction method for basements using the Analytic Hierarchy Process
Moscow State University of Civil Engineering, 129377, Moscow, Russia
* Corresponding author: Alimaaruf450@gmail.com
In the construction industry, there are two methods for constructing basements (Top-Down) and (Bottom-UP). The difference between them lies in the sequence of works, since in the (Bottom-Up) method the end of the excavation work is the necessary condition for the beginning of the substructure construction, and this is different from the (Top Down) method where excavation and construction of the substructure and the superstructure are carried out in parallel, which significantly reduces the project duration but at the same time increases the construction cost. Also there is a difference in terms of use for each of these two methods, for example, it is preferable to use the (Top-Down) in dense urban areas, where there is not enough space for the construction and where there are concerns that the adjacent buildings may be deformed as a result of construction, and this is what the (Bottom-Up) method cannot provide. In order to determine the optimal method from a mathematical point of view, 7 main criteria and 25 sub-criteria were identified, and the Analytic Hierarchy Process was used to solve this multi-criteria problem. Using the Expert Choice software, we found that the (Top-Down) method is preferred by 14.8% more than (Bottom-Up), and a sensitivity analysis was performed to determine which criteria dominated our optimal result.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.