Issue |
E3S Web Conf.
Volume 258, 2021
Ural Environmental Science Forum “Sustainable Development of Industrial Region” (UESF-2021)
|
|
---|---|---|
Article Number | 10025 | |
Number of page(s) | 11 | |
Section | Training Personnel for Agricultural Industry | |
DOI | https://doi.org/10.1051/e3sconf/202125810025 | |
Published online | 20 May 2021 |
Industrial sector engineering staff development systems
Saint-Petersburg State University of Aerospace Instrumentation, 190000, Bolshaya Morskaia str., 67, Saint-Petersburg, Russia
* Corresponding author: atgs@yandex.ru
This article discusses methods for the employees quality and performance improvement in the electric power industry enterprises. The characteristics of the factors influencing the development of personnel are given. The foreign experience of corporate training is analyzed, which identifies ways to improve labor activity, maintain labor discipline, increase the level of labor motivation, develop corporate culture and increase the employee loyalty at industrial enterprises. The structure of personnel training methods at the enterprise is schematically presented. The article substantiates the need for the formation of a qualified human resource that provides the company with the growth of economic indicators of production activity, a high degree of competitiveness in the industry market, and a positive image of the organization
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.