Issue |
E3S Web Conf.
Volume 258, 2021
Ural Environmental Science Forum “Sustainable Development of Industrial Region” (UESF-2021)
|
|
---|---|---|
Article Number | 11002 | |
Number of page(s) | 8 | |
Section | Sustainable Energy Power Strategies | |
DOI | https://doi.org/10.1051/e3sconf/202125811002 | |
Published online | 20 May 2021 |
Synthetic and coal-water fuels improving is the instrument of industrial region sustainability increasing
1 Retiree, 30, Chicherina str., 454003, Chelyabinsk, Russia
2 Chelyabinsk State University, 129, Bratiev Kashirinykh str., 454001 Chelyabinsk, Russia
* Corresponding author: r90r@mail.ru
New methods of processing bituminous and brown coal in synthetic and coal-water fuel production are now gaining relevance. On the one hand, this is dictated by the pragmatic need to reduce the dependence of industrial energy consumers on the prices and quality of hydrocarbon raw materials, especially in the context of the constant exacerbation of market restrictions associated with the pandemic and sanctions, on the other hand, there is an urgent need for environmentally friendly methods of using synthetic and coal-water fuels. The article discusses the currently used technologies for the production of synthetic and coal-water fuels. The authors identify its main disadvantages and limitations and propose a schematic diagram of a technological line for coal-water fuel production with a linear layout. It allows obtaining fuel with good fluidity and higher stability, high-calorie content, and low ash content with less energy consumption.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.