Issue |
E3S Web Conf.
Volume 260, 2021
2021 International Conference on Advanced Energy, Power and Electrical Engineering (AEPEE2021)
|
|
---|---|---|
Article Number | 01021 | |
Number of page(s) | 5 | |
Section | Advanced Energy and Environmental Engineering | |
DOI | https://doi.org/10.1051/e3sconf/202126001021 | |
Published online | 19 May 2021 |
PV for PV to accelerate carbon neutrality
Guangdong University of Science & Technology, Dongguan 523083, China
* Corresponding author: 3301954919@qq.com
The cost of carbon neutrality is too expensive. How to find a cheaper and more feasible approach to realize it? This paper studies the innovative development mode of PV for PV-Max speed. Through the three-stage “PV for PV” development plan, After 2023, China's annual capacity can reach 400 GW, with a total investment of about $96 billion. After 2032, China's PV installation can reach 4000 GW, annual power generation is 5200TWh, and annual CO2 emission reduction is 4.4 Gt. After 2033, it will be an export period, with an annual export revenue of $54 billion. By 2046, it will be able to export a total of 5300 GW, with an annual power generation of 6890 TWh. It will reduce the CO2 emissions of 10.2 Gt for the world every year. If the PV plant is built in the three northern regions of China, combined with desertification control, the western desert will become a "green valley".
Key words: Carbon neutrality / PV for PV / Desertification / Green revolution
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.