Issue |
E3S Web Conf.
Volume 261, 2021
2021 7th International Conference on Energy Materials and Environment Engineering (ICEMEE 2021)
|
|
---|---|---|
Article Number | 01001 | |
Number of page(s) | 6 | |
Section | Energy Development and Energy Storage Technology Research and Development | |
DOI | https://doi.org/10.1051/e3sconf/202126101001 | |
Published online | 21 May 2021 |
Power Coordinated Control of Micro Sources of MMC Series Microgrid Based on Model Prediction
College of Electrical and Information Engineering, Lanzhou University of Technology, Lanzhou, Gansu, 730050, China
* Corresponding author: Wangxg8201@163.com
To improve the utilization rate of micro sources of MMC series structured microgrid in a gridconnected operation mode, a prediction-based coordination control strategy of micro-source power of bridge arm is proposed in this paper. The connection between the output power and the delta carrier is determined by analyzing each generation unit’s output power. Each micro source’s output power is controlled independently by using the carrier-wave variable amplitude phase-shift modulation method. A finite control set-model predictive control algorithm is used to predict the next cycle’s power using the carrier amplitude of the current cycle as the controlled input. The optimal switching state for the next cycle is determined according to the coordination principle of “more work for more energy.” Through simulation, the coordination strategy can effectively control the maximum power output of the bridge arm and improve the micro source’s utilization rate.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.