Issue |
E3S Web Conf.
Volume 263, 2021
XXIV International Scientific Conference “Construction the Formation of Living Environment” (FORM-2021)
|
|
---|---|---|
Article Number | 04028 | |
Number of page(s) | 8 | |
Section | Engineering and Smart Systems in Construction | |
DOI | https://doi.org/10.1051/e3sconf/202126304028 | |
Published online | 28 May 2021 |
The economic effect of the implementation of the differential pressure in the gas distribution
Moscow State University of Civil Engineering, Yaroslavskoe shosse, 26, Moscow, 129337, Russia
* Corresponding author: klo4ko_aleksey@mail.ru
This paper demonstrates the problem of calculating a rational piezometric pressure distribution graph in high-and medium-pressure gas distribution networks. These issues are particularly relevant in the design of gas distribution networks. In addition to the often used in practice design opportunities to reduce the cost of building gas distribution networks, rational choice of the optimal configuration of gas pipelines, which gives us the opportunity to get a large economic, as well as the effect of preserving the environment, it is also possible to use the pressure drop in the network. In total, with a rational choice of the scheme of organizing gas supply to consumers in localities, it is possible to get the maximum economic effect. It is important that modern equipment of this type allows to implement a single-stage scheme of gas distribution networks. Construction of natural gas pipelines we can use the available pressure drop in various technical solutions, but the reasonable distribution of the pressure drop between the network sections allows us to obtain a positive economic effect. The algorithm shown is proposed for use in the design of gas distribution networks of settlements of all types, and in the supply of natural gas to industrial enterprises.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.