Identification of the level of innovativeness of a complex major construction project
Moscow State University of Civil Engineering, Yaroslavskoe shosse, 26, Moscow, 129337, Russia
* Corresponding author: polity_violca@list.ru
The complexity of a project as a system is characterized by the variety of elements and the number of possible initial and future states. It is possible to give an accurate mathematical description of a complex system based on the study of entropy. The entropy of states is defined as a measure of the diversity of the set of possible options. A construction project that includes a large number of heterogeneous innovative components belongs to the group of complex projects. The problem of control is to reduce its diversity by reducing the set of all states to a subset of states that satisfy the goals of control. Consequently, the essential characteristics of the innovativeness of a construction project should be studied in relation to the sphere of occurrence of the effect from the application of innovations. It seems logical to consider the effects of the introduction of innovations throughout the life cycle of an investment and construction project, which can be presented as an integral production and economic system.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.