Issue |
E3S Web Conf.
Volume 264, 2021
International Scientific Conference “Construction Mechanics, Hydraulics and Water Resources Engineering” (CONMECHYDRO - 2021)
|
|
---|---|---|
Article Number | 02040 | |
Number of page(s) | 7 | |
Section | Road Construction, Building Structures and Materials | |
DOI | https://doi.org/10.1051/e3sconf/202126402040 | |
Published online | 02 June 2021 |
High-strength concrete technology for manufacturing reinforced concrete sleepers from prestressed reinforced concrete
Tashkent State Transport University, Tashkent, Uzbekistan
* Corresponding author: urinbekdj@mail.ru
The properties of concrete with complex chemical additives to improve the technology for the production of sleepers from prestressed concrete are discussed in the article. With the use of complex chemical additives under heat-moisture processing, at a temperature of 40°C, there was no decrease in the strength of the cement stone and sufficient strength at the initial stage of the curing period, 44.7 MPa; concrete strength was determined with the addition of Glenium 27 S - 1.0% and the hardening accelerator Master X -Seed 100 - 1.2%. Thus, the use of complex chemical additives makes it possible to solve the problem of achieving the necessary early high strength of concrete to implement low-temperature technology in the production of reinforced concrete sleepers.
© The Authors, published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License 4.0, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.